Solutions
mainalt mainalt
Waste Water Treatment Plants
 
1. Nitrification Problems
Plant not nitrifying adequately and/or meeting discharge consent limits.
Read Solution »
 
2. General Organic Waste Problems
High levels of FOG/COD/BOD organic overload, high SS and sludge levels etc.
Read Solution »
 
Start up of new Plants
Read Solution »
 
Percolating filters; ponding, blocked sparge holes etc.
Read Solution »
 
Fixed Bed Reactors, RBCs etc; Plant failing to meet discharge levels.
Read Solution »
 
Lagoons: Malodours, sludge build up etc.
Read Solution »
 
3. Phenolic or other Hydrocarbon Wastes
Plant failing to meet discharge consent levels for phenol or other hydrocarbons.
Read Solution »
 
Start up of new plant or recovery from shock.
Read Solution »
 
4. Commercial Treatment Plants up to c.200P.E.
Plant overloaded or failing to meet discharge consent levels for COD, BOD and SS.
Read Solution »
 
Fat build up on bio-discs or filters
Read Solution »
 
Fat build up in Primary Tank.
Read Solution »
 
5. Filamentous Bulking
Bulking Sludge
Read Solution »
 
 
SIA “Fluido” Rīga, Ģertrūdes iela 101a, LV-1009. Reģ. nr. LV50003983771. Tālrunis +371 6728 1042
Copyright 2008 Fluido.LV. All rights reserved. Created by omni.lv